How to set a work package refresh interval in InLoox PM 7


Vous êtes ici: InLoox Support Documentation Aide en ligne InLoox for Outlook 7.0 Online Help InLoox PM 7 Work Package Features in InLoox PM 7 How to set a work package refresh interval in InLoox PM 7

With InLoox PM 7 you can set manually the refresh interval for work packages in the work package list.

A modification can only be done by an InLoox PM user with administrator permissions.

  1. Open the InLoox PM Options dialog box.

    For more information on how to open InLoox PM options, see Open the InLoox PM options.

  2. Under General options, click More options. On the right side there is the More options area.

  3. Set up the interval, which is shown in minutes.
  4. Click OK or Apply.
    The data will be saved in the data base and is valid for all InLoox PM users.